Electricity
Public service obligation
National Control Commission for Prices and Energy

Algirdo st. 27, LT-03219 Vilnius
Tel. +370 5 2135166,
fax. +370 5 2135270.
Email info@regula.lt
We are here
Public Service Obligations (PSO) in the Electricity Sector

1. PSO budget and price

No.

Index name

2007

2008

2009

2010

2011

2012

1.

Renewable energy sources (RES) PSO

17,3

15,8

37,5

43,8

87,8

115,37

2.

Combined Heat and Power Plant (CHPP) PSO

162,4

160,4

301,3

35,7

85,7

117,16

3.

Lithuanian Power Plant PSO

133

160,5

233,1

370,4

348

398,266

4.

Ignalina Nuclear Power Plant PSO

30

22,7

27,9

0

0

0

5.

PSO administrator (Market Operator) cost

(3,4)

(1,8)

(3,8)

(1,8)

0,5

0,5

6.

Connection revenues

-0,4

-1,7

-2,3

0

0

-1,07

7.

RES Connection to the transmission grid

40

13,5

29,9

0

0

0

8.

RES Connection to the distribution grid

-

-

-

-

0,8

0,168

9.

Imbalance of last year

6,4

10,5

0

-20

-6,4

-4,06

10.

RES balancing

-

-

-

-

5,3

12,3

11.

Strategic Projects

-

-

-

-

92

85

12.

PSO budget, mln. Lt

392,1

383,5

631,2

431,7

613,8

723,634

13.

PSO price, ct/kWh

3,95

3,72

6,39

4,73

6,01

7,04


2. Electricity purchase prices from the Combined Heat and Power Plants (CHPP), ct/kWh


No.

Index name

2007

2008

2009

2010

2011

2012

1.

UAB „Vilniaus energija“

-

-

-

-

-

-

2.

UAB „Vilniaus energija“ CHPP Nr. 2

16

19,88

29,34

16,25

26,39

30,73

3.

UAB „Vilniaus energija“ CHPP Nr. 3

15,36

19,09

28,18

16,98

23,88

27,41

4.

UAB „Vilniaus energija“ Salininkų katilinė CHPP

20,04

24,9

36,76

16,13

31,79

35,95

5.

UAB Kaunas CHPP

15,36

19,09

28,18

20,16

22,45

27,66

6.

AB „Klaipėdos energija“

16

19,88

29,34

16,85

25,96

29,99

7.

AB „Lifosa“

8,1

10,7

13,1

-

-

-

8.

AB „Panevėžio energija“

-

-

-

-

-

-

8.1.

AB „Panevėžio energija“ Panevėžio rajoninė katilinė Nr. 1

18,22

22,64

33,42

22,92

27,59

34,58

8.2.

AB „Panevėžio energija“ Panevėžys CHPP

21,28

23,85

34,33

25,96

24,38

31,43

9.

AB „Kauno energija“ Petrašiūnai CHPP

16

19,88

23,14

21

25,27

30,17

10.

UAB „Litesko“ filialas Druskininkų šiluma

18,22

22,64

33,42

23,91

29,67

-

11.

UAB „Litesko“ filialas Alytaus energija

-

21,87

30,73

19,23

24,48

30,46

12.

AB „Šiaulių energija“

18,22

22,64

33,42

20,12

28,29

-

13.

UAB „Utenos šilumos tinklai“

-

24,9

45,34

16,09

29,22

42,84

14.

UAB „Girių bizonas“

-

-

25,45

-

-

-

15.

UAB „ENG“ Pasvalio rajono katilinė

-

-

-

26,3

30,88

42,46

16.

AB „Klaipėdos mediena“

-

-

-

-

-

37,56

17.

AB „Baltijos elektrinių investicijos“

-

-

-

-

-

29,98

18.

AB „Kauno energija“ Noreikiškiai CHPP

-

-

-

-

-

37,56


3. Purchase prices and allowed funds of the electricity generation in Lithuanian Power Plant, which is necessary for the energy supply security


No.

Index name

2007

2008

2009

2010

2011

2012

1.

Electricity, which is necessary for the energy supply security, purchase price, ct/kWh

19

29,18

37,35*
32,00

29,31

30,75

37,27

2.

Sum, which is necessary for the power system security, mln. Lt

-

-

-

25,17

91,3**

65,145

* set the new price since 01/07/2009.
** from them – 70 mln. Lt for the financing of new AB Lithuanian PP block.


4. Electricity purchase prices from the producers, using renewable energy sources (RES), ct/kWh

No.

Index name

2007

2008

2009

2010

2011

2012

1.

Hydro Power Plants







1.1.

ĮC* ≤ 30
Purchase price

20

20

26

26

26

28

1.2.

30 < IC ≤ 350
Maximum price

27

1.3.

350 < IC ≤ 1000
Maximum price

27

1.4.

IC > 1000
Maximum price

22

2.

Wind Power Plants







2.1.

IC ≤ 30
Purchase price

22

22

30

30

30

37

2.2.

30 < IC ≤ 350
Maximum price

36

2.3.

IC > 350
Maximum price

28

3.

Biomass Power Plants







3.1.

IC ≤ 30
Maximum price

20

22
24**

30

30

30

50

3.2.

30 < IC ≤ 350
Maximum price

45

3.3.

350 < IC ≤ 5000
Maximum price

45

3.4.

IC >5000
Maximum price

37

4.

Biogas Power Plants producing electricity







4.1.

IC ≤ 30
Maximum price

20

22
24**

30

30

30

64

4.2.

30 < IC ≤ 350
Maximum price

58

4.3.

350 < IC ≤ 1000
Maximum price

58

4.4.

IC >1000
Maximum price

48

5.

Solar Power Plants (non-integrated into the building)







5.1.

IC ≤ 30
Maximum price

-

-

-

163

163

144

5.2.

30 < IC ≤ 100
Maximum price

133

5.3.

100 < IC ≤ 350
Maximum price

156

156

104

5.4.

IC >350
Maximum price

5.5.

100 < IC ≤ 1000
Maximum price

5.6.

IC > 1000
Maximum price

151

151

6.

Solar Power Plants (integrated into the building***)







6.1.

IC ≤ 30
Maximum price

-

-

-

163

163

180

6.2.

30 < IC ≤ 100
Maximum price

166

6.3.

100 < IC ≤ 350
Maximum price

156

156

128

6.4.

IC >350
Maximum price

6.5.

100 < IC ≤ 1000
Maximum price

6.6.

IC > 1000
Maximum price

151

151

* IC – installed capacity, kW.
** Exploitation started till 01/01/ 2008 – 22 ct/kWh, after 01/01/2008 – 24 ct/kWh.
*** Solar Power Plants, integrated into the building, - such power plants, which are assembled into the building and used as part of the building surface, totally replacing the corresponding area of roof or wall of the building.




Last Update: 2012-02-09 10:47