Connection fees


Connection fees from 1st June, 2018:

There are two ways to determine connection to the grid price:

1. Public procurement. This method is applied if increased permissible capacity exceeds 500 kW. In that case household consumers pay 20 %, other consumers (except household) – 40 %, producers of electricity – 100 %  of contractor's working price. Also, for project preparation household consumers get 40 %, other consumers – 10 % discount.
2. Formula and Commission approved fees. This method is applied if increased permissible capacity does not exceed 500 kW. Formula:
Price = Fee for 1 kW * Increased permissible capacity  + Fee for 1 m
* Shortest geometrical distance from connection point to consumer object

Connection fees approved by Commission (100 %):


Consumer group
Fee for 1 kW of increased permissible capacity (PC), Eur without VAT Fee for 1 m of electricity network, Eur without VAT
I group (PC < 50 kW, no network reconstruction or project needed)  19,93  -
 II group (PC < 100 kW, network reconstruction and project needed) 130,9321,91
III group (100 <= PC <= 500)59,90  21,34


Household customers pay 20% of the approved connection fee:

 Consumer group Fee for 1 kW of increased permissible capacity (PC), Eur without VAT Fee for 1 m of electricity network, Eur without VAT
I group (PC < 50 kW, no network reconstruction or project needed)3,99 -
II group (PC < 100 kW)26,19   4,38
III group (100 <= PC <= 500)11,98   4,27


Example:
Permissible capacity – 15 kW
No reconstruction or project needed
Connection price = 3,99 Eur * 15 kW= 59,85 Eur

All other consumers except household consumers pay 40% of the approved connection fee:


Consumer group
Fee for 1 kW of increased permissible capacity (PC), Eur without VAT Fee for 1 m of electricity network, Eur without VAT
I group (PC < 30 kW, no network reconstruction or project needed) 7,97-
II group (PC < 50 kW)52,37   8,76
III group (50 <= PC <= 100)23,96   8,54


Example:
Permissible capacity – 15 kW
Network reconstruction and project needed
Shortest geometrical distance – 20 m
Project is prepared by consumer.
Connection price = 52,37 Eur * 15 kW + 8,76 Eur * 20 m = 960,75 Eur 