Sign In
Published: 2/9/2014. Updated: 5/26/2017

Connection fees


Connection fees from 1st June, 2017:

There are two ways to determine connection to the grid price:

1. Public procurement. This method is applied if increased permissible capacity exceeds 500 kW. In that case household consumers pay 20 %, other consumers (except household) – 40 %, producers of electricity – 100 %  of contractor's working price. Also, for project preparation household consumers get 40 %, other consumers – 10 % discount.
2. Formula and Commission approved fees. This method is applied if increased permissible capacity does not exceed 500 kW. Formula:
Price = Fee for 1 kW * Increased permissible capacity  + Fee for 1 m
* Shortest geometrical distance from connection point to consumer object

Connection fees approved by Commission (100 %):

Consumer groupFee for 1 kW of increased permissible capacity (PC), Eur without VATFee for 1 m of electricity network, Eur without VAT
I group (PC < 50 kW, no network reconstruction or project needed)

19,23

  -
 II group (PC < 100 kW, network reconstruction and project needed) 102,7921,28
III group (100 <= PC <= 500)48,86  20,88


Household customers pay 20% of the approved connection fee:

 Consumer groupFee for 1 kW of increased permissible capacity (PC), Eur without VATFee for 1 m of electricity network, Eur without VAT
I group (PC < 50 kW, no network reconstruction or project needed)3,85 -
II group (PC < 100 kW)

20,56

  4,26
III group (100 <= PC <= 500)

9,77

  4,18


Example:
Permissible capacity – 15 kW
No reconstruction or project needed
Connection price = 3,85 Eur * 15 kW= 57,75 Eur

All other consumers except household consumers pay 40% of the approved connection fee:


Consumer group
Fee for 1 kW of increased permissible capacity (PC), Eur without VATFee for 1 m of electricity network, Eur without VAT
I group (PC < 30 kW, no network reconstruction or project needed)

7,69

-
II group (PC < 50 kW)

41,12

  8,51
III group (50 <= PC <= 100)

19,54

  8,35


Example:
Permissible capacity – 15 kW
Network reconstruction and project needed
Shortest geometrical distance – 20 m
Project is prepared by consumer.
Connection price = 41,13 Eur * 15 kW + 8,51 Eur * 20 m = 787,15 Eur 

Archive: prices valid from June, 2016prices valid from June, 2015, prices valid from June, 2014.