Sign In
Published: 3/13/2017. Updated: 3/13/2017

Connection fees (valid from June, 2015)


There are two ways to determine connection to the grid price:
1. Public procurement. This method is applied if increased permissible capacity exceeds 500 kW. In that case household consumers pay 20 %, other consumers (except household) – 40 %, producers of electricity – 100 %  of contractor's working price. Also, for project preparation household consumers get 40 %, other consumers – 10 % discount.
2. Formula and Commission approved fees. This method is applied if increased permissible capacity does not exceed 500 kW. Formula:
Price = Fee for 1 kW * Increased permissible capacity  + Fee for 1 m * Shortest geometrical distance from connection point to consumer object      

                                                                     Connection fees approved by Commission (100 %):


Consumer group
Fee for 1 kW of increased permissible capacity (PC) without VAT Fee for 1 m of electricity network without VAT
I group (PC < 50 kW, no network reconstruction or project needed)
Eur 28,13-
LTL97,13​-
II group (PC < 100 kW, network reconstruction and project needed)​Eur 126,5921,78
LTL437,0975,20
III group (100 <= PC <= 500)​​Eur 52,1022,52
LTL179,8977,76

                                                    Household customers pay 20% of the approved connection fee:
  Consumer group Fee for 1 kW of increased permissible capacity (PC) without VAT Fee for 1 m of electricity network without VAT
I group (PC < 50 kW, no network reconstruction or project needed)
​​​​Eur
5,63-
LTL​19,44-
II group (PC < 100 kW)
​​​​Eur
25,324,36
​​LTL
87,4215,05
III group (100 <= PC <= 500)
​​​​​Eur
10,424,50
LTL
 35,98
15,54
*Fee for household consumers who prepare project themselves.

Example:

Permissible capacity – 15 kW
No reconstruction or project needed
Connection price = 5,63 Eur * 15 kW= 84,45 Eur or 291,60 LTL

                             All other consumers except household consumers pay 40% of the approved connection fee:


Consumer group
Fee for 1 kW of increased permissible capacity (PC) without VAT Fee for 1 m of electricity network without VAT
I group (PC < 30 kW, no network reconstruction or project needed)
​​​​Eur
11,25-
LTL​  38,84-
II group (PC < 50 kW)
​​​​​Eur
50,648,71
LTL
 174,85
30,07
III group (50 <= PC <= 100)
​​​​​Eur
20,849,01
LTL
​  71,9631,11

*Fee for all other consumers (except household consumers) who prepare project.

Example:

Permissible capacity – 15 kW
Network reconstruction and project needed
Shortest geometrical distance – 20 m
Project is prepared by consumer.
Connection price = 50,64 Eur * 15 kW + 8,71 Eur * 20 m = 933,80 Eur  or  3224,15 LTL