There are two ways to determine connection to the grid price:

1. Public procurement. This method is applied if increased permissible capacity exceeds 500 kW. In that case household consumers pay 20 %, other consumers (except household) – 40 %, producers of electricity – 100 %  of contractor's working price. Also, for project preparation household consumers get 40 %, other consumers – 10 % discount.
2. Formula and Commission approved fees. This method is applied if increased permissible capacity does not exceed 500 kW. Formula:
Price = Fee for 1 kW * Increased permissible capacity  + Fee for 1 m
* Shortest geometrical distance from connection point to consumer object

 

Connection fees approved by Commission (100 %):


Consumer group

Fee for 1 kW of increased permissible capacity (PC), Eur without VAT

Fee for 1 m of electricity network, Eur without VAT

I group (PC < 50 kW, no network reconstruction or project needed)

  22,87
 
  -
 II group (PC < 100 kW, network reconstruction and project needed)

153,47

17,08

III group (100 <= PC <= 500)

57,01

  19,51


Household customers pay 20% of the approved connection fee:

 Consumer group

Fee for 1 kW of increased permissible capacity (PC), Eur without VAT

Fee for 1 m of electricity network, Eur without VAT

I group (PC < 50 kW, no network reconstruction or project needed)

4,57

 -

II group (PC < 100 kW)

30,69

 
  3,42

III group (100 <= PC <= 500)

  11,40
 
  3,90

Example:

Permissible capacity – 15 kW
No reconstruction or project needed
Connection price = 4,57 Eur * 15 kW= 68,55 Eur

 

All other consumers except household consumers pay 40% of the approved connection fee:


Consumer group

Fee for 1 kW of increased permissible capacity (PC), Eur without VAT

Fee for 1 m of electricity network, Eur without VAT

I group (PC < 30 kW, no network reconstruction or project needed)

9,15

 

-

II group (PC < 50 kW)

61,39

 
  6,83

III group (50 <= PC <= 100)

22,80

 
  7,80


Example:

Permissible capacity – 15 kW
Network reconstruction and project needed
Shortest geometrical distance – 20 m
Project is prepared by consumer.
Connection price = 61,39 Eur * 15 kW + 6,83 Eur * 20 m = 1057,45 Eur